Consider changing wording of Milestone timeline filter
Reported by: |
Ryan J Ollos <ryan.j.ollos@…> |
Owned by: |
Ryan J Ollos |
Priority:
|
normal
|
Milestone:
|
1.1.2
|
Component:
|
timeline
|
Version:
|
1.1.1dev
|
Severity:
|
normal
|
Keywords:
|
|
Cc:
|
|
Branch:
|
|
Release Notes:
|
Milestone timeline filter label changed from Milestones reached to Milestones completed.
|
API Changes:
|
|
Internal Changes:
|
|
A very minor suggestion to change Milestones reached → Milestones completed. The latter is less ambiguous, because one might assume that Milestone reached means that the due date has been eclipsed and the event should be displayed in the timeline whether or not the milestone has been completed, but actually the event is only displayed in the timeline if the milestone has been completed. Also, the event is displayed in the timelines as Milestone milestone1 completed.
Please find the change in the attached patch.
Change History
(6)
Description: |
modified (diff)
|
Component: |
general → timeline
|
Milestone: |
→ 1.1.2
|
Owner: |
set to Remy Blank
|
Status: |
new → assigned
|
Release Notes: |
modified (diff)
|
Resolution: |
→ fixed
|
Status: |
assigned → closed
|
Owner: |
changed from Remy Blank to Ryan J Ollos
|
Patch against r11682 of the trunk.